Concord Communications

RECENT PROJECTS

  • May 2007 - HOAG Hospital - Installation of Cat 5e, Fiber Optic Cabling and Toshiba Phone CIX100 Systems for Individual Dr.’s offices.
  • April 2007 - Copper Mountain College - Installation of Cat5e and Fiber Optic Cabling.
  • April 2007 - Elsinore Valley Municipal Water District - Continue to supply our valued client Cat5e installations.
  • March 2007 - Murrieta Hot Springs Medical Center - Installation of Cat5e and Fiber Optic Cable.
  • March 2007 - Penske Truck Leasing - Installed Conduit throughout services bays.  Installed connections for time clocks.
  • February 2007 - George Fisher, LLC - Installed wireless access points throughout warehouse and offices.
  • January 2007 - WHG  - Reconfigured and installed routers and installed Dmarc extensions at 45 different Pizza Hut, Applebee’s and KFC’s throughout Wisconsin.
  • December 2006 - Macy’s - Installed an average of twenty (20) Cat5e and Dmarc extensions in 38 stores across Minnesota, Wisconsin and Michigan.
  • November 2006 - Petco - Installed Kiosk’s, Learning Centers and POS Systems along with Cat5e for all systems for 60 Petco’s in southern California.

Other projects under Management include:

  • Country Villa Health Services - "Remodel Corporate Office Project". Installed eighty (80) new Cat 6 data cables thoruhgout offices and abatement of all old cabling after new cabling system was implemented.
  • Tetra-Tech - Installed 420 Cat 6 data cables and 200 Cat 5e voice data cables in new 2-story corporate headquarters in Pasadena, CA. Installed 12" ladder racking system throughout major pathways on both floors. Built-out communications room (MDF) and (IDF). Installed 6-Strand 50 micron fiber between (MDF) and (IDF).
  • Burlington Coat Factory Distribution Center - (San Bernardino, CA) Installed 503 Cat 5e data cables, installed 600 feet of cable tray above dock doors; Installed sevem (7) IDF's in warehouse each having 100PR Cat3 feed and 12-Strand multi-mode fiber back to MDF, installed 127 locations in offices and warehouses with RG-6 coax and mounted and adjusted 127 fixed cameras; Installed cable and speaker or horn 322 locations within warehouse and office areas.
  • Pennisula Beverly Hills Hotel- Installed twenty-two (22) Cat 6 data cables and twenty-two (22) Cat 5e voice cables; Installed nice (9) ceiling speakers and volume controls and connected to existing paging systems; Installed 100 PR feed cable and 6-strand fiber from spa IDF to MDF.
  • Ted Porter Elementary School - Fontana unified School District -Installes 620 Cat 6 data cablea and 300 Cat 6 voice cables to eight (8) buildings on campus; installed four (4) Cat 5e 25 pair cables between MDF and each of the seven (7) IDF racks; Installed 6-strand multi-mode and 6-strand single-mode fiber from MDF to each of the seven (7) IDF racks. Project completed in 94 days.
Phone: 951.757.6100 | Fax: 951.677.7291 | 35874 Darcy Place, Murrieta, CA 92562